Kerbside EV charging isn’t a turf war. It’s a fairness test.
Networks aren’t “creeping” into consumer energy. They’re proposing open-access infrastructure that keeps competition where it counts for drivers.
What networks would do
Energy Networks Australia’s proposal to the Australian Energy Market Commission (AEMC) is straightforward. Distribution networks would install, own and maintain kerbside charging hardware, often on power poles that already line our streets.
They would not sell electricity or charging services, or hold any retail relationship with drivers. Instead, retailers and charging providers would access the infrastructure on open terms and compete for customers on price and service.
The real monopoly risk
The alternative is competition for locations. Whoever locks up the best kerb wins. Over time, the strongest players take the best sites, smaller ones drop out, and drivers are left with fewer choices and higher prices.
That is how unregulated local monopolies form. It’s the same dynamic as the freeway petrol station that charges more because it’s the only option. The driver who needs to charge pays whatever that site asks. Each extra cent per kWh costs an average EV driver around $22 a year.
Who’s missing out
Australia has 41 EVs for every public charger. The global average is 11.
The people with the most at stake are renters, apartment residents and households without a driveway. A transition that only works for people with a garage isn’t working for Australia.
Networks can move fast and at low cost. In NSW, one distributor could install up to 40 kerbside chargers a week, at roughly $1.60 to $2.10 per customer per year.
Getting the settings right
Questions about utilisation, parking and cost recovery are fair, and the AEMC process is the place to test them. The process is there to get the settings and incentives right to locate chargers where they are needed. But the choice isn’t networks versus competition.
Open-access infrastructure keeps competition where it belongs, on price and service, not on who owns the kerb.
Read the full article by ENA’s Chief Operations Officer Dominic Adams on The Driven.